Central Science Lab Island
Central Science Lab Island — Central island bench seats 4-8 students for group lab work Material: Solid epoxy resin or phenolic resin worktop; 1.5 mm powder-coated cold-rolled steel frame. Dimensions: Standard length 2400-3600 mm (customizable). Custom sizes available; production 30-45 days with photo report before shipment.
Central Science Lab Island is a Hymebel education furniture product built for hotel, office, villa, healthcare and education projects. It is made to order: production takes 30-45 days and minimum order is typically 20-30 units depending on project scope.
Technical specifications
| Dimensions | Standard length 2400-3600 mm (customizable) |
|---|---|
| Material | Solid epoxy resin or phenolic resin worktop; 1.5 mm powder-coated cold-rolled steel frame |
| Finish | Lab-grade chemical-resistant surface, Grade 1 (ASTM D1308) |
WhatsApp: +8613702279783 · h@hysdfurniture.com
- Made to order — from drawings, 3D models or on-site measurements
- EAC TR CU 025/2011 compliant, backed by 8 international certifications
- 30-45 day production; 9-10 days by rail to Central Asia
- Photo report and material certificates issued for every shipment
Full solution: see our education furniture catalogue for the complete range and project references.
Compare across this range
Compare similar models on material, dimensions and delivery terms to pick the right fit for your project.
| Attribute | Central Science Lab Island this model | University Student Desk & Chair (Wood Finish) | Teacher Desk & Podium | Open-Concept Library Shelving |
|---|---|---|---|---|
| Dimensions | Standard length 2400-3600 mm (customizable) | Customizable per auditorium gradient and row spacing | 1400 x 750 x 1050 mm (customizable) | Single bay W900 x D450 x H2200 mm (customizable up to H3000 mm) |
| Material | Solid epoxy resin or phenolic resin worktop; 1.5 mm powder-coated co | HPL tabletop with anti-scratch and anti-microbial finish; heavy-duty | E1 eco-friendly MDF with melamine finish; 1.5 mm powder-coated cold- | Cold-rolled carbon steel uprights with E0 MDF or solid wood veneer s |
| Finish | Lab-grade chemical-resistant surface, Grade 1 (ASTM D1308) | Modern wood-grain laminate; matte anti-corrosion powder-coated steel | Wood grain / solid wood veneer or fireproof laminate; brushed stainl | Electrostatic epoxy powder coating; oak, walnut, beech or custom col |
| Production lead time | 30-45 days | 30-45 days | 30-45 days | 30-45 days |
| Minimum order | 20-30 units | 20-30 units | 20-30 units | 20-30 units |
Frequently asked questions
What is the minimum order quantity?
Typically 20-30 units depending on project type, with volume pricing applied on wholesale projects.
Can you produce from our drawings?
Yes — we manufacture from drawings, 3D models or reference images, and adapt dimensions to your project requirements.
What are your lead times?
30-45 days production, then 9-10 days by rail to Central Asia (5-7 days by TIR truck). Documentation travels with the shipment.
Let's discuss your project
Send your plans, measurements or drawings — we prepare a commercial proposal within 48 hours.
Get a free quote