Bespoke Hotel Guestroom Furniture
Bespoke Hotel Guestroom Furniture — Iconic integrated headboard with precision gold metal trim Material: E0-grade MDF / solid ash frame, 304 stainless steel trim, 55kg/m3 HR foam. Dimensions: Custom per suite layout (bed, vanity desk, lounge, wardrobe). Custom sizes available; production 30-45 days with photo report before shipment.
Bespoke Hotel Guestroom Furniture is a Hymebel hotel furniture product built for hotel, office, villa, healthcare and education projects. It is made to order: production takes 30-45 days and minimum order is typically 20-30 units depending on project scope.
Technical specifications
| Dimensions | Custom per suite layout (bed, vanity desk, lounge, wardrobe) |
|---|---|
| Material | E0-grade MDF / solid ash frame, 304 stainless steel trim, 55kg/m3 HR foam |
| Finish | PVD gold metal inlays; anti-scratch UV lacquer 4H hardness (matte/gloss) |
WhatsApp: +8613702279783 · h@hysdfurniture.com
- Made to order — from drawings, 3D models or on-site measurements
- EAC TR CU 025/2011 compliant, backed by 8 international certifications
- 30-45 day production; 9-10 days by rail to Central Asia
- Photo report and material certificates issued for every shipment
Full solution: see our hotel furniture catalogue for the complete range and project references.
Compare across this range
Compare similar models on material, dimensions and delivery terms to pick the right fit for your project.
| Attribute | Bespoke Hotel Guestroom Furniture this model | Round Teak Outdoor Dining Set (6-8 Seats) | Stackable Banquet Chairs | Bar Height Tables (Wood & Metal) |
|---|---|---|---|---|
| Dimensions | Custom per suite layout (bed, vanity desk, lounge, wardrobe) | Table D1600x750mm (6-8 seater); chair W580xD600xH820mm, seat H450mm | H930 x W450 x D520mm | Overall H42in (106.7cm); top 1.5in thick; custom lengths 48-120in |
| Material | E0-grade MDF / solid ash frame, 304 stainless steel trim, 55kg/m3 HR | FSC-certified Grade-A solid teak, UV-resistant olefin flat rope, 35k | High-tensile steel frame (2.0mm wall), molded cold-cured foam 50kg/m | Solid acacia / white oak / walnut top, 2x2in tubular carbon steel ba |
| Finish | PVD gold metal inlays; anti-scratch UV lacquer 4H hardness (matte/gl | Multi-layer anti-UV nano teak oil seal; custom walnut or PU weathere | Nano-electroplated brushed gold PVD; fire-retardant velvet/PU uphols | 7-layer catalyzed PU low-sheen matte; matte black powder-coated base |
| Production lead time | 30-45 days | 30-45 days | 30-45 days | 30-45 days |
| Minimum order | 20-30 units | 20-30 units | 20-30 units | 20-30 units |
Frequently asked questions
What is the minimum order quantity?
Typically 20-30 units depending on project type, with volume pricing applied on wholesale projects.
Can you produce from our drawings?
Yes — we manufacture from drawings, 3D models or reference images, and adapt dimensions to your project requirements.
What are your lead times?
30-45 days production, then 9-10 days by rail to Central Asia (5-7 days by TIR truck). Documentation travels with the shipment.
Let's discuss your project
Send your plans, measurements or drawings — we prepare a commercial proposal within 48 hours.
Get a free quote